Back to Engineering Tools

Cooling Tower CoC Calculator & Filing Deadline Tracker

Calculate Cycles of Concentration (CoC), evaporation loss, and required blowdown rates, plus generate NYC Local Law 77, NYS Part 4, and ASHRAE 188 cooling tower filing & drift eliminator reminder packs.

Hot return temp minus cold supply temp.

Cycles of Concentration

4.0 CoC

Evaporation Loss

10.0 GPM

Required Blowdown

3.3 GPM

Maintaining proper blowdown rates prevents dissolved solids from precipitating as mineral scale. Scale insulates biofilm, allowing Legionella to survive chemical disinfection.

Municipal Filing Deadline Tracker & Reminder Pack

Cooling Tower Registration, Sampling & Drift Eliminator Deadlines

Select your jurisdiction and enter your last cleaning & Legionella sampling dates to compute upcoming statutory deadlines and export ready-to-import CSV or Calendar (.ics) reminders.

NYC Local Law 77 (Title 24 RCNY Ch. 8): $500 – $10,000/day DOHMH civil penalties for missed certification, cleaning, or 90-day Legionella sampling.
Weekly Water Quality & Biocide Residual VerificationRoutineTitle 24 RCNY §8-04(a)

Verify pH, conductivity/CoC, biocide residual, and heterotrophic dip-slide count (<10,000 CFU/mL).

2026-12-01
Due in 7d
Drift Eliminator & Mechanical Compliance InspectionInspectionTitle 24 RCNY §8-04(b)

Qualified person inspects drift eliminators for gaps/fouling, nozzles, fill media, and basin sediment.

2026-12-09
Due in 15d
Quarterly Legionella Culture Sampling (ELAP Lab)SamplingTitle 24 RCNY §8-04

Collect representative basin sample via NYS ELAP-certified lab and log CFU/mL response actions.

2026-12-19
Due in 25d
Semi-Annual Tower Cleaning & DisinfectionCleaningTitle 24 RCNY §8-05

Drain, mechanically clean wetted surfaces/basin, and apply hyperhalogenation disinfection per MMP.

2027-03-09
In 105d
Annual Cooling Tower Certification Filing (DOHMH Portal)FilingTitle 24 RCNY §8-08 / Local Law 77

Submit signed annual certification of inspection, cleaning, disinfection, and Legionella testing via the NYC DOHMH portal.

2027-11-01
In 342d

Stop Guessing. Start Controlling.

Now that you have your engineering numbers, let us automate the compliance. Build a complete, audit-ready ASHRAE 188 Water Management Plan tailored to your specific building topology in 15 minutes.

Live ASHRAE 188 Generator

Preview your ASHRAE 188 draft in 15 minutes (1 control point free) or start a 14-day trial.

Build Free ASHRAE 188 Plan
Free Surveyor Defense Asset

12-Point Water Safety Surveyor Inspection Checklist

The exact verification protocol used by state health inspectors and CMS surveyors to audit ASHRAE 188 & 514 compliance, dead-leg flushes, and closed-loop CAPA records.

CMS Tag A-0164 & F-880 citations
Thermal & biocide control limits